PDFPrintE-mail

Region of Peel Waste Management

Good reasons to power your business with
renewable energy.
Waste Management Facility 2005

Challenge: Installation of a multi-level waste sortation system to maximize throughput.

Solution: Installation of 3 separate control panels linked to a central control to achieve high efficiency.

Dial One Wolfedale Electric handled the electrical installation of the base building and the installation of the automated conveyor and other systems.  Three separate control panels were installed and linked to central control room to allow for maximum throughput throughout the building.

Result:  This multi-level system is the newest technology of its kind in the GTA, and was successfully installed and commissioned within five months.