Challenge: To maintain a reliable cold storage environment for consumable products and enable high volume product flow throughout the building.
Solution: Comprehensive electrical design and installation of switchboards, generators, conveyors, and a product retrieval system. This seven-month, $2.8 million project encompassed the 320,000 square foot ambient and cold storage facility for Tim Hortons consumable products.
Dial One Wolfedale Electric installed a 15kv main switchboard and two 4000 Amp 600v switchboards on each of the North and South ends of the complex. In addition, two generators were installed to ensure back-up power in the event of a failure. The system will accommodate several 100 & 400HP compressors for refrigeration purposes.
An Automated Conveyor and Product Retrieval System was installed to enable high volume flow throughout the building. Outside the facility, five high mast, 100 foot poles were installed to ensure adequate lighting for all parking areas and entrances to the property.
|